Coentunnel

Project: Sealing joints of the Coentunnel
Description of the project:
At the Coentunnel all the cable-ducts needed to be sealed to prevent the water from intruding. First, all joints were thoroughly cleaned. Afterwards the joints were treated with the B-Primer and then filled with the Liquid Rubber JointFiller in a mastic gun.

Toggle Content goes here